Mike and Noble laid 80 feet of PVC pipe (a little more than half the distance up to the garden from the nearest valve box). A new drip system for the garden boxes in the works.
And after working Noble like that, Mike figured he owed him a little mano-y-mano, doing something more interesting. So they built a skate ramp. yeehaw!
(I'll be making up waivers for all of Noble's buddies' parents to sign. Just kidding. Sort of.)
Also today:
- Mike and I mapped out the race course(s) for the up-coming annual NPA 5K/1mile.(And I FINALLY figured out the Garmin watch Mike got me for Christmas. I never claimed to be quick with technology.) My goal for the race this year: NO ONE gets lost.
- We assembled the soil components for my new square foot garden boxes this year. Not sure how I'll like this method - but it's sure to save on water. I need to get shakin' so I can get things planted.
Doing our best to keep things productive.
No comments:
Post a Comment